After using SBS modified bitumen plant for a period of time, various problems will always occur. So, how to check whether the SBS modified bitumen plant is qualified?
Analyze the problem of modifier. Generally, the amount of modifier added should be in place, and the pH should be adjusted according to the quality of the water used.
Because ordinary asphalt also has different classifications, when producing modified asphalt, it is necessary to pay attention to whether the raw materials used are ordinary asphalt and ensure the quality.
Check SBS modified bitumen plant. If the gap of the emulsified asphalt colloid mill of the emulsifier used for a long time will become larger, you need to adjust it to continue production.
There is no 10m high temperature-conducting barrel on the two parallel expansion tanks, which is higher than the temperature-conducting barrel. It forms a negative pressure on the hot air in the tank, so that most of the high-temperature gas is discharged from the tank through the barrel. The temperature of the material guide part is lowered, and then the cloth material of the material guide part is bonded with the modifier material.
SBS modified bitumen plant temperature in the melting and expansion tank is above 180 degrees Celsius, it is easy to appear that the modifier adheres to the blanking trough on the upper part of the spiral feeding device, which will cause the accumulated modifier to fall smoothly. Requires regular management and maintenance of SBS modified bitumen plant.