Created by potrace 1.15, written by Peter Selinger 2001-2017
PRODUCTS

INQUIRY

Wechat:+86 18224529750
*
*
Four problems that need attention in winter construction
January 14, 2023
The weather is cold in winter, what should we pay attention to when building asphalt pavement?

1. Construction of asphalt mixture surfaces on urban expressways and arterial roads is prohibited.

1

2. When the construction temperature of the sub-trunk road and the road below it is lower than 5°C, the construction should be stopped.
3. The construction of adhesive layer, permeable layer and sealing layer is prohibited.
4. When construction must be carried out, the mixing, delivery and construction temperature should be appropriately increased.
MOBILE:  +86 18224529750

Longxiang Industrial Park ,

Weidu District, XuChang,HeNan, China

*
*
Global Partner

Copyright © 2024 Henan Sinosun heavy Industry Corporation. Amallink.com
TOP