Created by potrace 1.15, written by Peter Selinger 2001-2017
PRODUCTS

INQUIRY

Wechat:+86 18224529750
*
*
How to Maintain Modified Asphalt Equipment
December 27th, 2019

The modified asphalt equipment automatically adjusts the proportion of emulsion and asphalt according to the real-time flow signal to ensure the quality of the finished product. So, how to maintain modified asphalt equipment?

The modified asphalt produced by the modified asphalt equipment should retain or increase the original asphalt's cohesiveness, plasticity, and fluidity, and improve the temperature stability and elasticity of the asphalt. 

Modified asphalt equipment adopts advanced and scientific production technology, which can continuously produce finished polymer modified asphalt up to 30 tons / hour. It can meet the needs of various applications, and produce modified asphalt with high road performance and stability.

 

1. Modified asphalt equipment heater adopts spiral plate or tube-and-tube heat exchanger. The matrix asphalt is quickly heated by heat-conducting oil to meet the needs of the production process.

The dust in the control cabinet needs to be cleaned once every six months. The dust can be removed with a blower to prevent the dust from entering the machine and damaging the parts. The colloid mill needs to add butter once for every 100 tons of emulsified asphalt.

After using the modified asphalt equipment mixer, the oil level needs to be checked frequently. If the modified asphalt equipment is stopped for a long time, the liquid in the tank and pipeline needs to be drained, and the moving parts also need to be filled with lubricating oil. Pay more attention to the maintenance of modified asphalt equipment.

2. Quality inspection of modified emulsified asphalt equipment

Modified emulsified asphalt equipment needs to be tested to know whether the equipment meets the standards. Many people do not know the steps to check the compliance of the modified emulsified asphalt equipment for the first time. Next, we will introduce the method of modified emulsified asphalt equipment.

(1) Check the modified emulsifier. If the gap of emulsified asphalt colloid mill of emulsifier used for a long time will become larger, then we need to adjust it to continue production. This is a relatively simple problem.

(2) Analyze the problem of modifiers. In general, the amount of modifiers must be in place. When adding, the pH value should be adjusted according to the quality of the water used. This problem requires professional personnel to analyze.

(3) The problems caused by the modified emulsified asphalt equipment itself, because ordinary asphalt also has different classifications. When producing modified asphalt, pay attention to whether the raw materials used are ordinary asphalt and the quality is guaranteed. Regular inspection of modified emulsified asphalt equipment shall be conducted to avoid unnecessary failures.

MOBILE:  +86 18224529750

Longxiang Industrial Park ,

Weidu District, XuChang,HeNan, China

*
*
Global Partner

Copyright © 2024 Henan Sinosun heavy Industry Corporation. Amallink.com
TOP